Cookie we can sit here all day and pull reference form the BS 7671 and posting table 710 which is in the medical locations. What’s that aboutAsking about the code's reasoning. And Megawatt- I fully get you!
Cookie we can sit here all day and pull reference form the BS 7671 and posting table 710 which is in the medical locations. What’s that aboutAsking about the code's reasoning. And Megawatt- I fully get you!
Yes I missed table 41.1 maximum disconnection times on page 55 as far as how are the voltages are derived starts with AC and DC theory710? I had 41.1 in mind. I'm curious how those voltage cutoff values were derived.
Yes I missed table 41.1 maximum disconnection times on page 55 as far as how are the voltages are derived starts with AC and DC theory
We can test breakers or RCDs but we can’t fix them if there are 1/10th of a second to slow, as far as I go if they trip I’m happy. I read your profile and I applaud you for wanting to learn but don’t just post things you are reading and asking why. I’m here to help anyone that needs it if I can. I’m going to ask you a question are you from the UK or USUK wiring requires that general socket and lighting circuits trip a breaker in a required amount of time based on the line to earth voltage.
If you are looking for reasons why the code wants this or that is something every body wants. You have hundreds of people who make up rules and regulations in the BIS 7671 and they all have different opinionsAsking about the code's reasoning. And Megawatt- I fully get you!
So we got something in common good luckI'm from the US- but want to learn about both.
Sorry Dan and have a great dayStaff have cleared up some posts in this thread. Please keep threads on topic and don't respond to rubbish, just report it, it saves us time. Cheers.![]()

Err OK then.
www.electriciansforums.net