Hello all
just bit of advice or just checking myself, got off cuts of 25mm from the plant room meter location points as until we laid it all out weren't sure exactly what lengths required.
So question I would use singles from ryefeild panel to meter locations & meter to switch fuse, if I sleeve the singles chopped of the armour cable & sheath would there be a problem using this to in fill the above?
I don't see it but just would like to check