could anyone please advice..
is it ok to run meter tails from an existing supply to a second board about 20meters away to supply a 8way split board wich will run 2 stand up sunbed capsules and a ring circuit and a lighting circuit..???
 
Fusion, if you intend on installing a new set of tails into the henley blocks, you need to be aware that the maximum run for mains tails is only 3m. You could always fit an fused isolator next to the henley blocks, and come from that using swa or twin pvc etc to the new board..:)
 