HI all,

With the changes recently to building control i'm being asked more often to quote for new builds, both for builders/electrical contractors as well as private homeowners.

I've found that i get in pretty early to get the roof side done but have to wait months to get in and get it wired and commissioned due to the length of time that the builders take.

This means that with standard RECC terms i end up with a lot of money outstanding while having supplied most/all of the materials and done most of work so just wondering if anyone has any pointers on how to structure contracts/payments so that i'm not exposed.

Thanks,
e
 
stage payments.

We have a 20% stage payment at panel installation stage, 20% upon final completion (10% initial deposit, 50% advance equipment payment at 21 days in advance).
 
We do staged payments, deposit and advance, upon panels installed, upon inverter installed, commissioned - later only applies to self build / custom build as we can then work with the EPC provider re timing of commissioning. If commissioned before the EPC issued, lower (reduced rate) FiT payments.
 
Thanks Worcester. If the pv is required by building control is it able to get the higher tariff at all? I had assumed that the epc would be done after the commissioning...

E
 
if the owner wants higher FIT then there needs to be 2 EPC's produced, 1 before the solar is commissioned, 1 afterwards (and after the MCS cert and FIT application submitted if you want to be really safe.)
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
South West

Thread Information

Title
New builds
Prefix
N/A
Forum
Green Lounge (Access Only)
Start date
Last reply date
Replies
7

Advert

Thread statistics

Created
Energetic,
Last reply from
Energetic,
Replies
7
Views
179

Advert

Back
Top