Hi All
I’m in need of a bit of advice. I’ve recently started a new job and have been given the task of relocating some machinery. There are 3 separate machines on the line with 1 feed from a bus bar with a 35mm cable protected by 125a fuses.
What I’m planning is to take the feed to the first machine through a main switch, then to a terminal block and off to 3 separate 80a fus
I’m in need of a bit of advice. I’ve recently started a new job and have been given the task of relocating some machinery. There are 3 separate machines on the line with 1 feed from a bus bar with a 35mm cable protected by 125a fuses.
What I’m planning is to take the feed to the first machine through a main switch, then to a terminal block and off to 3 separate 80a fus