I got a call for a few jobs to be done. went round there, they wanted New CU, About 10m of surface trunking chased in and capped, New light under stairs, New light above desk (from pull chord) and replace a few sockets n switches with polished brass stuff he had already bought. About a weeks work I thought. I went in at £900. When was doing the work he got chatting and told me he had 4 other quotes most expensive at £4200!!!. Is this bloke serious or do you recon he just didnt want to do it?
 
Hmmm, i think he may have been pulling your chain mate.

Even the biggest con man in the world couldnt come up with a price like that!!
 
when I started out I called around for 'quotes' to get a feel for rates. One of the places I called were pimlico plumbers (also electricians) in london (on a recomendation from a friend who manages properties) and their rates would probably have put that job at around that price.
 
I got a call for a few jobs to be done. went round there, they wanted New CU, About 10m of surface trunking chased in and capped, New light under stairs, New light above desk (from pull chord) and replace a few sockets n switches with polished brass stuff he had already bought. About a weeks work I thought. I went in at £900. When was doing the work he got chatting and told me he had 4 other quotes most expensive at £4200!!!. Is this bloke serious or do you recon he just didnt want to do it?


Personally for a CU upgrade, I charge £150 for the PIR and start at £350 for the CU upgrade itself.

the 10m of trunking, how big is it i.e. how many cables?

The light under the stairs is thwe CU under the stairs so there is | local supply or are there no supplies near by?

the desk lamp, it depends how old the house is, as if varies if they are traditional floor board or sheets of chipbard under the carpet?

ok you say it is about a weeks work for £900, so I take it your daywork rate is £180 a day?
does that amount mean the wages you draw from the business yourself or does that include the business costs aswell?

are you taking into account public liability insurance?
the depreciation of your vehicle?
running costs of a vehicle@
depreciation of any plant?
costs for advertising?
stationary?
holiday pay?
the cost of the CU and any other materials or consumabkles that yiou will require?
The £2.50 to report the job for part P
the costs for you to be registarted with a part P registared biody?

Yes I know all the above figures breakdown to a couple of pounds here and there but they do add up and bite into your bottomline.

Personally I think you went in to cheap as there are hidden cost such as what I have listed above.
I do however feel that £4200 is to expensive as you could rewire the whole house for that figure.

I hope that this does not cloud the issue

Richard
 
I got a call for a few jobs to be done. went round there, they wanted New CU, About 10m of surface trunking chased in and capped, New light under stairs, New light above desk (from pull chord) and replace a few sockets n switches with polished brass stuff he had already bought. About a weeks work I thought. I went in at £900. When was doing the work he got chatting and told me he had 4 other quotes most expensive at £4200!!!. Is this bloke serious or do you recon he just didnt want to do it?
a weeks work :confused: 3 days max i would say ;)
 