When I mentioned it the excuse was that they were 15th edition sparky's and things have change since they did their apprenticeships.

What, Im totally shocked! There are time served electricans electricians out there that havent kept up to-date with currrent regs .....
 
i just dont get the idleness though of some...

i have been on a full rewire on a 4 bed house (on my own)...all the joists etc were drilled as needed with enough clearance for the cables to pull successfully...so 3 holes per joist was what was required....

4 days and first fix done...
 
Totally different things. Cable does not need maintenance and you don't normally want to look at it for fun, so if the route is safe, compliant and efficient to install, there's no point making more work for yourself to run it a 'nicer' route. But unneccessary, inaccessible JBs in a new build, simply poor.
 
Any other non compliances you spotted/were asked to install ?
I spotted some wiring from downstairs running up the wall upstairs then branching off to the sides half way up the wall. Just waiting for someone to drill through them some time in the future. I didn't say anything because I was just the Electrical Trainee getting some experience you see. Upset them and bang goes my experience.....
 
Last edited by a moderator:
Totally different things. Cable does not need maintenance and you don't normally want to look at it for fun, so if the route is safe, compliant and efficient to install, there's no point making more work for yourself to run it a 'nicer' route. But unneccessary, inaccessible JBs in a new build, simply poor.
mind you...theres some that would happily hide in the corner pulling their tail over a drum of twin...
 
so where was your camera when it mattered?

come on...you know the rules..
I didn't have a camera on me. And I don't think I would have lasted long if I was photographing their work. But saying that I left after a week as I the only thing I was learning was how "not" to do it.
 