J
johnboy6083
it looks like a sarel to me matey.











View attachment 14233
Personally I would have butted the adaptable box and the CU up to each other purely for aesthetic reasons, also used a smaller adaptable box to save cutting into the timber frame, I hope the frame isn't bearing much weight. Also run the earth back through the box and out of the bottom, but that's just me.
View attachment 14237
The way the box is mounted the ship lap will allow water to run straight onto the mating surface of the outlet, I would bring it out with a couple of batons just to be safe.
Ra of 37 ohms is good, get another rod in and get better, it's all good practice.
Edit: Blinding flash of light... Why not terminate the SWA straight into the CU as it's a plastic enclosure, just don't connect the earth/armour fly lead?
. I will bring that socket out like you say. i was originally going to terminate it directly but the dis board enclosure was so small, I was going to struggle to gland it properly, so I decided to gland it into a separate box to make sure it was done properly. I'm nervous about the assessment just trying to make sure everythings the best I can do
thanks for your help 
It was fibreglass or ABS from RS. It had to be non-ferrous as it was used on a glueing station where the operators taped a magnet to the glue gun and stuck it to the previous (metal) enclosure, the glue got everywhere gumming up a keyswitch and pushbuttons. I also made the aluminium guard below to protect the wiring from the same problems.
I would have used a metal or more rigid adaptable box in the shed, the SWA is distorting the box in picture (just asthetics). Where the T&E transitions to SWA, I've always drilled a hole at the side of the gland and bolted the earth ring to the box, then use a second nut to hold ring crimp on earth wire.
How did you get on pulling T&E through the tube, would singles have been easier?
what make is that enclosure in pic 1
Just one of my solar inverter installs in the garage, since February the customers supplier owes him £1,000
![]()
Just serviced the generator ready for the winter and thought I'd get a picture of what I did a couple of years ago....
I even built the "shed" it lives in :smile5:
Is this somewhere without mains supply, or just because you get frequent power cuts?