I am working on some archway lighting, after a finished install the contractor has changed his mind and wants all of the lights to come on at lux level 35 and half to switch off at 70 lux level via photocell.
I have wired the lights in a leap frog way as the lights are on both sides and the contractor wants a zig zag pattern when half are on.
My issue is I have 1 feed and no way of getting a new one. is this even possible or should I recommend a dusk until dawn photocell for one half and a time clock for the other?
I have wired the lights in a leap frog way as the lights are on both sides and the contractor wants a zig zag pattern when half are on.
My issue is I have 1 feed and no way of getting a new one. is this even possible or should I recommend a dusk until dawn photocell for one half and a time clock for the other?