Just a query I have, I'm working on new build houses and the meter intake is some distance (say 15-20mts) from the consumer unit, would I be right in using SWA 25mm 3 core to supply the CU. Also which termination method would one use at the external intake position as space would be limited for an adaptable box. I don't like glanding the SWA at the CU and leaving it inside as many do. Cheers for your thoughts.
Just a query I have, I'm working on new build houses and the meter intake is some distance (say 15-20mts) from the consumer unit, would I be right in using SWA 25mm 3 core to supply the CU. Also which termination method would one use at the external intake position as space would be limited for an adaptable box. I don't like glanding the SWA at the CU and leaving it inside as many do. Cheers for your thoughts.