What I'm trying to ask mate is an alternative to SWA as it's not the best to work with or terminate in these circumstances.
well...as i have said...its the SWA...or the top end RCD...choice is yours...
i know what `id be doing..

you could of course protect the tails in an earthed metallic covering/enclosure...such as a trunking....but i know what `id be rather doing..

whats wrong with using an SWA?....surely you can gland it off first...then offer it up to the enclosure...if its working space your worrying about...
 
its a bit like the scene out of casino isn`t it..

`you can either have the hammer..and the money...

or you and your friend can leave now....but if i ever see either of you again`....lol..
 
that's only if connected direct to the dno cutout if they are fused down that's not a problem
 
The run of cable will be connected directly to cutout/meter which is located inside the usual domestic (white/brown) box external to the building. The run of cable will be 15-20 mts which can be run internal via joists an partition wall to the CU, as u will all know 3core 25mm SWA isn't the easiest to work with in these circumstances and I'm looking for an easier more workable alternative and looking for productive advice........don't know if I can make this easier without being awkward?
 
The run of cable will be connected directly to cutout/meter which is located inside the usual domestic (white/brown) box external to the building. The run of cable will be 15-20 mts which can be run internal via joists an partition wall to the CU, as u will all know 3core 25mm SWA isn't the easiest to work with in these circumstances and I'm looking for an easier more workable alternative and looking for productive advice........don't know if I can make this easier without being awkward?
eh?..

you really are not paying attention are you...

whats wrong with pulling a 25mm 3 core SWA through some joists?

and further more you will need a KMF to protect the DNO equipment so..

the tails from the meter go into the KMF....then from there you take tails out into an adaptable box...from the adaptable box to the SWA....and then on to the board

drill joists slightly oversize for the SWA and take your time...should get it through..

honestly, i dont know whats up with you mate...
 
eh?..

you really are not paying attention are you...

whats wrong with pulling a 25mm 3 core SWA through some joists?

and further more you will need a KMF to protect the DNO equipment so..

the tails from the meter go into the KMF....then from there you take tails out into an adaptable box...from the adaptable box to the SWA....and then on to the board

drill joists slightly oversize for the SWA and take your time...should get it through..

honestly, i dont know whats up with you mate...

Listen mate don't carry on like u are doing!

There is nothing wrong at all in pulling a 25mm 3core SWA through joists, I don't think u can comprehend what I'm trying to say, without trying to patronise you, this is supposed to be a forum for like minded qualified and experienced electricians asking for friendly advice on certain circumstances that may arise in our working life's. Have a read back on previous comments an either use it to help or keep stum!
 
Listen mate don't carry on like u are doing!

There is nothing wrong at all in pulling a 25mm 3core SWA through joists, I don't think u can comprehend what I'm trying to say, without trying to patronise you, this is supposed to be a forum for like minded qualified and experienced electricians asking for friendly advice on certain circumstances that may arise in our working life's. Have a read back on previous comments an either use it to help or keep stum!
lol...

grow up divvy...

do the job rite...or go for a concentric...its upto you....lolffs...lol..
 
Listen mate don't carry on like u are doing!

There is nothing wrong at all in pulling a 25mm 3core SWA through joists, I don't think u can comprehend what I'm trying to say, without trying to patronise you, this is supposed to be a forum for like minded qualified and experienced electricians asking for friendly advice on certain circumstances that may arise in our working life's. Have a read back on previous comments an either use it to help or keep stum!
oh aye...

not what you were saying at #22 is it....

lol...another know nowt...
 
oh aye...

not what you were saying at #22 is it....

lol...another know nowt...

******REMOVED**********, that's done a 2 year course we all know them! People like u give us proper tradesman a bad name........jog on and find a new hobby!
 
Last edited by a moderator:
**********REMOVED******** that's done a 2 year course we all know them! People like u give us proper tradesman a bad name........jog on and find a new hobby!

i guess your course was about..let me see...oh 5 WEEKS?...lol..

like you?..someone who doesn`t even know the correct choice of cable to use?

and by the way, i spent 3 years at college....plus the other stuff (2382, 2391 etc)
 
Last edited by a moderator:
*************REMOVED*********** that's done a 2 year course we all know them! People like u give us proper tradesman a bad name........jog on and find a new hobby!

To be fair, it has been pointed out that SWA is the way to go for this, it's what I'd use given how you intend to run it. You've even been given clear instructions of how to install it. Not enough for you? You still need more? ********REMOVED*******
 