Hope it wasn't you GUILTY@buzzlightyear that put those cables in the joists and didn't follow building regs?
giphy.gif
guilty .
 
Thinking about it you could avoid disclaimer by re-wiring and engender more confidence without the disclaimer. If you have any doubt then why do it that way? I think also humour aside the report would be more verbose as people want to know why you are recommending a full re-wire. Tests and inspection which is usually the larger part would confirm the need and justify recommendations.
 
Insurance companies won't pay for a blanket rewire for flooded premises in this neck of the woods. Last time I quoted for this their loss adjuster refused point blank but in doing so the responsibility for future wiring issues became his and not mine.
 
I'm being asked to report by the surveyor.
I presume the reason he hasn't asked the original contractor is for third party independent views.. Therefore I doubt I would be able to benefit from the works recommend, although it is my plan to try.
I still fell re-wire is extreme.

Vortigern, "if the walls etc. are off it is not a big deal to replace cable so maybe a rewire."
I disagree, on this level of spec it is a considerable cost difference if not necessary.
 
An EICR is pointless at this stage, and the surveyor/main contractor/ insurance co know it.
Live tests are a no no.
Even if your IR read ok, damage can be caused to cables during rip out. Visual inspection beforehand, then during works before walls go back up.
EICR or full test once complete? Im going full test on mine as I changed the DB
 
I bet the people who put in the sprinkler system are already buying tickets to a non extraditable country.
I had thought that sprinkler systems had connection to the fire alarm so if they went off they couldn't do so "on the quiet" (?).
 
Advise to install a system that detects water leaks from the sprinkler system, where is the build and why have a water fire suppression system?
 
Agree, I'd replace them. The original warranty won't be honoured now, I bet.
Move the Family out to safe accomodation, remove all the accessories, leave it for a week portable A/C units fed from a temp supply, comeback, retest the insall, repair any concerns, retest again, not rocket science really.
 