Totally irrelevant. And there is nothing in the Regs about making a CU 'airtight' , if anything that's counter productive as we're told to install in such a way to minimise the build up of heat or words to that effect.
As far as is reasonably practicable, to contain any fire within the enclosure or cabinet and to minimise the escape of flames.
 
Imagine telling a customer that they need to spend a load of money on a new metal consumer unit, telling them how much safer it is in a fire and then leaving a dirty great hole in their wall partition.

There is no argument for not sealing it up.
 
Imagine telling a customer that they need to spend a load of money on a new metal consumer unit, telling them how much safer it is in a fire and then leaving a dirty great hole in their wall partition.

There is no argument for not sealing it up.
Here we go again 😀

I tried using that naff grommet strip, including super gluing it, never stays it place, even when carefully inserting a larger cable. Hager bespoke grommet is the same. Manufacturers should come up with something more substantial.
 
people C2 open backed wylex boards on a flammable wall if no paxolin sheet, but then wang a load of these knockouts out for 6 cables to come in 🤯😄
 
Totally irrelevant. And there is nothing in the Regs about making a CU 'airtight' , if anything that's counter productive as we're told to install in such a way to minimise the build up of heat or words to that effect.
I think that most people would know what Brian meant when saying “airtight”.

Also, I don't understand how you can disagree about leaving a dirty, great hole in a wall cavity.

Have a read of section 527.
 
I think that most people would know what Brian meant when saying “airtight”.

Also, I don't understand how you can disagree about leaving a dirty, great hole in a wall cavity.

Have a read of section 527.
Has the penetration breached a fire compartment because if not no further action is required.
 
Has the penetration breached a fire compartment because if not no further action is required.


The metal CU should be treated as a form of fire barrier/containment, that being the whole reason for having metal CUs in the first place.

Cutting a hole that size in a wooden partition and leaving it cannot be said to be the work of a decent electrician.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
The Future of Fuse boards...?
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
117
Unsolved
--

Advert

Thread statistics

Created
Dustydazzler,
Last reply from
Mike Johnson,
Replies
117
Views
9,995

Advert

Back
Top