Edd
Call the DNO, wait 45 mins on the phone. DNO will turn up and give you the option of digging up the street or to go PME..
When you choose the PME option (and you will) they will leave and say it needs to be booked in by the meter supplyer as they dont do it themselfs.
make sure gas and water bond is up to size.
Good luck