D

Ducksy

Hey folks, im wiring in a shower circuit, i've decided on singles in PVC trunking (10mm line/neutral) (4mm CPC) I've worked out my cable factor in trunking as 87.2...................Problem is OSG shows smallest size trunking as 50mm X 38mm Thats way to big!!!!

Can anyone point me in the right direction for the trunking factors for smaller pvc trunking......?

Sorry if it sounds a dumb question but i normally use twin and earth clipped direct......sod fitting that in trunking.

Thanks.
 
If it was singles I would run a 6mm2 haha, I would like to run a 10mm2, but it would be a complete nightmare to connect into the pull cord switch, so 6mm2 would just have to do, but everyone to their own, in a T&E I am aware it is only 4mm2, another silly decision by the cable manufacturers.
 
If it was singles I would run a 6mm2 haha, I would like to run a 10mm2, but it would be a complete nightmare to connect into the pull cord switch, so 6mm2 would just have to do, but everyone to their own, in a T&E I am aware it is only 4mm2, another silly decision by the cable manufacturers.

I would love to use 6mm but the shower is a 10.5kw....in trunking 6mm CCC is only 38a far below the 44a needed :(
 
I think you're working it out wrong, you might even find 1mm could be sufficient.

I probably am lol.......pob....I showed my girlfriend a video of pob washing he's pants on YouTube....the **** we used to watch....she had no idea who he was....I felt old lol
 
In over 25 years in the game i have seen numerous bits of trunking either plastic or metal absolutely rammed solid with cables.Plenty of times i have seen whole bottles of fairy liquid and planks of wood and hammers used to crush even more in,and bits of lid tied on with tie wraps because the buckles wont turn.And that is on new build prestige jobs not just lash ups.What is in the OSG quite often bears no resemblance to what happens on site
 
In over 25 years in the game i have seen numerous bits of trunking either plastic or metal absolutely rammed solid with cables.Plenty of times i have seen whole bottles of fairy liquid and planks of wood and hammers used to crush even more in,and bits of lid tied on with tie wraps because the buckles wont turn.And that is on new build prestige jobs not just lash ups.What is in the OSG quite often bears no resemblance to what happens on site

I don't think that could be called a ''Prestige Job'', if that's what's being allowed to happen!!
 