Fell down stairs in a bungalow? See no point adding another board, ample capacity in the existing one.
You would not install a RCBO fed from the existing RCD. The existing RCD supplying the additional MCB should be just fine, provided it tests out ok. You could install a RCBO dedicated for the shower circuit if the existing CU has room or can be simply modified to accept one fed direct from the main CU switch (assuming the CU has one). I guess this would be the ideal option, though the cost and practicality may not make it viable.The board has about 5 free ways in it left, think ill go with the majority and put the mcb in with the existing board. The RCD on the existing board is sufficient protection? I wouldn't need a 50A RCBO, a 50A MCB would suffice?
Could be a dormerFell down stairs in a bungalow? See no point adding another board, ample capacity in the existing one.

Bungalow converted with a room above the double garage. Had all the work finished and then bang down the stairs. Fair to say they didn't invite me back after that. Think I will go for the easy option and install an MCB in the board and make sure all tests meet requirements.Could be a dormer![]()

So, if you are a member - in your own name - then you just notify the job to NICEIC on line. NICEIC themselves advise the Local Authority & the customer.Im a member of NICEIC over here in Northern Ireland. Not sure about notifying the local authority, I usually have all my jobs planned for me and any work in the quarry I just get on with and test when installing new circuits. I record the results and hand into the office at work.
Been told we don't have to actually be a member of any body or notify building control in Northern Ireland. All we have to do is notify the DNO of the additional power demand.So, if you are a member - in your own name - then you just notify the job to NICEIC on line. NICEIC themselves advise the Local Authority & the customer.