Im adding a new RCBO and SWA from existing power bollard to new IP rated enclosure what certificate would you do? I think EIC but the bollard consists of 100amp main switch and 2x rcbos for sockets
Now on particular of instal at origin do I do the bollard? Or where the bollard is fed from eg panel?
Then distribution details I’m only adding power to a IP rated box?
 

OFFICIAL SPONSORS

Back
Top