B
BillyH
What options do i have for terminating a 16mm 3 core swa into a plastic consumer unit?
In the context of mechanical or earthing ?
are you using the 3rd core as cpc? if so, then the armour only needs earthing at the supply end.
So i would'nt need to use a gland. I could just expose the conductors and connect as per mains tails
Try and fit a conduit box to the consumer unit,it can be fixed securely reducing strain on the cons unit and allow the termination of the Swa to be done