1

1shortcircuit

I've been asked to go and price a job based on an EICR that the client has had done. Some strange coding in my opinion but just wondering what you guys think?:thumbsup
 

Attachments

  • ScreenHunter_01 Mar. 07 16.08.jpg
    ScreenHunter_01 Mar. 07 16.08.jpg
    201.4 KB · Views: 450
  • ScreenHunter_02 Mar. 07 16.08.jpg
    ScreenHunter_02 Mar. 07 16.08.jpg
    80.6 KB · Views: 229
  • ScreenHunter_03 Mar. 07 16.09.jpg
    ScreenHunter_03 Mar. 07 16.09.jpg
    125.4 KB · Views: 219
  • ScreenHunter_04 Mar. 07 16.09.jpg
    ScreenHunter_04 Mar. 07 16.09.jpg
    195.8 KB · Views: 229
  • ScreenHunter_05 Mar. 07 16.10.jpg
    ScreenHunter_05 Mar. 07 16.10.jpg
    214.9 KB · Views: 231
  • ScreenHunter_06 Mar. 07 16.10.jpg
    ScreenHunter_06 Mar. 07 16.10.jpg
    174.3 KB · Views: 210
  • ScreenHunter_07 Mar. 07 16.11.jpg
    ScreenHunter_07 Mar. 07 16.11.jpg
    168.8 KB · Views: 261
  • ScreenHunter_08 Mar. 07 16.11.jpg
    ScreenHunter_08 Mar. 07 16.11.jpg
    101.3 KB · Views: 214
Does not meet Redulations! a new Regulation of some sort? lol.

I suppose I better look over it properly.
 
Unidentified circuits put as Code 3 on observations but as Code 1 on Inspection, I could be here all day picking holes in this, blimey that is a badly filled report.
 
Hi all, just to jump on the bandwagon, have a look at this certificate and let me know your thoughts, was a customer of ours who had this report done as part of their rental agreement on a posh estate in Highgate, Same firm prob does about 50 houses on the same estate.

Enjoy

SKMBT_22312030717540_0001.jpgSKMBT_22312030717540_0002.jpgSKMBT_22312030717540_0003.jpgSKMBT_22312030717540_0004.jpgSKMBT_22312030717540_0005.jpgSKMBT_22312030717540_0006.jpgSKMBT_22312030717540_0007.jpgSKMBT_22312030717540_0008.jpgSKMBT_22312030717540_0009.jpgSKMBT_22312030717540_0010.jpgSKMBT_22312030717540_0011.jpg
 

Attachments

  • SKMBT_22312030717460_0001.jpg
    SKMBT_22312030717460_0001.jpg
    234.1 KB · Views: 119
  • SKMBT_22312030717460_0002.jpg
    SKMBT_22312030717460_0002.jpg
    206.4 KB · Views: 110
  • SKMBT_22312030717460_0003.jpg
    SKMBT_22312030717460_0003.jpg
    338.8 KB · Views: 112
  • SKMBT_22312030717460_0004.jpg
    SKMBT_22312030717460_0004.jpg
    223.4 KB · Views: 112
  • SKMBT_22312030717460_0005.jpg
    SKMBT_22312030717460_0005.jpg
    218 KB · Views: 106
  • SKMBT_22312030717460_0006.jpg
    SKMBT_22312030717460_0006.jpg
    208.9 KB · Views: 100
  • SKMBT_22312030717460_0007.jpg
    SKMBT_22312030717460_0007.jpg
    88.2 KB · Views: 106
  • SKMBT_22312030717460_0008.jpg
    SKMBT_22312030717460_0008.jpg
    88.9 KB · Views: 89
  • SKMBT_22312030717460_0009.jpg
    SKMBT_22312030717460_0009.jpg
    95.2 KB · Views: 102
  • SKMBT_22312030717460_0010.jpg
    SKMBT_22312030717460_0010.jpg
    48.2 KB · Views: 97
  • SKMBT_22312030717460_0011.jpg
    SKMBT_22312030717460_0011.jpg
    73.3 KB · Views: 99
Unidentified circuits put as Code 3 on observations but as Code 1 on Inspection, I could be here all day picking holes in this, blimey that is a badly filled report.

Totally agree.

I only looked at the first page, it seems that whoever filled that report out needs to have a good read through the guidance notes for the codes. For example the "No RCD throughout installation" is down as a C1, or the C1 for the bathroom fan being 230v, the bit about needing a hammer and screwdriver (butcher!) to access the fuse board is a C3. To put it mildly the report is a load of nonsense, but probably contains some genuine (if incorrectly coded) issues.

The customer's not going to be happy about paying for another report though. I guess someone's going to get the ear bent, and hopefully reported to their scheme for being a muppet.
 
ADS on an old install ? Code 1's on a boiler cover, Code 1 for no rcd ? Identification of circuits Code 1 lol, Code 1 for cables concealed in walls ? Gas boiler not fixed Code 1 (must be a Gas Safe check too) Clip missing from a light Code 1, There's loads of crap on there. By the looks of it no one should be in the property with all that danger around. Someones looking for a nice wager by the looks of things

5s disonnection time for a 5/15 fuse ?
0.01 on end to ends ?

Throw that report in the bin
 
Last edited by a moderator:
Whoever filled that in is clearly an idiot that needs to go back to school, learn english, then go and learn to be an electrician again!
 
1short fairly poorly coded, written and explained EICR, looks like they may have done the testing at least but observations and tick boxes do not match up and codes are generally incorrect in my opinion.

A1G
can't read a lot of the report because of the background but what I can read does seem OK at first glance, slightly surprised there is 16mm bonding but could be someone being keen. The defect sheet is not part of the report and should not be included as part of the report. recommendations should be in a cover letter, not in the report.
The statement old MCBs may not work and suggesting an injection test must be pure conjecture, surely.
Codes are a bit odd and recommendations are also sometimes strange.
 
fairly poorly coded, written and explained EICR, looks like they may have done the testing at least but observations and tick boxes do not match up and codes are generally incorrect in my opinion.

Whilst I am sure there are some very valid observations I do not believe that I'm going to be rubber suited to walk in there which is almost the impression I get when reading the report.

I think the person who conducted the test needs to remind themselves why a code 1 would be issued and what needs to be done when reporting a code 1.

Reading that report made me wonder why I have chosen not to provide this service yet lol Seems unlike this chap, I am aware of my limitations ;)

Thanks for your replies:thumbsup
 

OFFICIAL SPONSORS

Back
Top