Well done Dill - I was just going to say that's a load of ********, but you were slightly more polite. I think Mr Onions needs a little more time back in the soil.

The problem is you'll do anything for an easy life.
 
Last edited by a moderator:
When I can be arsed to I will dig out paperwork for this, on your assessment ask him the correct procedure for the earthing arrangement for an out building and if he says you can export/extend the equipotential zone I've got a 12 inch penis, I'm not saying this is the best way to do it but it is the CORRECT way and if you are being assessed then its the way i would do it

- - - Updated - - -

Oh and we all have the right to have different opinions that's life.
 
Again dillb spouting off about **** you don't know, you get permission off the supplier and I will apologise. You go rough it in.

the only time the DNO may object to extending a pme supply is when its to a building that is metal in construction or has structural steel.
your other assumptions will fold faster than a pack of cards in a tornado.
i await your best insult.
;-)
 
Last edited by a moderator:
the only time the DNO may object to extending a pme supply is when its to a building that is metal in construction or has structural steel.
your other assumptions will fold faster than a pack of cards in a tornado.
i await your best insult.
;-)

Have you ever requested permission before, what is the correct way to feed an out building is the question not how you would do it! So answer that
 
Have you ever requested permission before, what is the correct way to feed an out building is the question not how you would do it! So answer that

i'm not answering jack **** from someone who only a few days ago said they gave C2 EICR defect for a fan that wasnt fused down from the lights.
 
Last edited by a moderator:
So the chance of a fan stalling and a possible fire risk is a code ?

- - - Updated - - -

The definition of code 2 biff tell me if you know without using google
 
Oh mate . . . . Im more confused than when i first posted now.
Everyone does things differently the best thing to do is ask your assessor. I get bored of arguing on here to be honest when I first joined it was all just a bit of banter but now you get so called super sparks on here who think they are the oracle of electrical, don't like other people opinions if they are different from there's or involves them doing more work. Let us know what your assessor says.
 
I rang two mates today, both in their late 50's, both had different opinions, so i guess i will just use common sense.
I will bond the armour at the main CU end and use the spare 6mm as my earth for the garage CU, at worst i will get an observation against me. I have had this chap once before and he is always keen to teach.

Thanks for the help and entertainment gents!
 
The first rule of Electricinasforum Club is: You do not talk about Electricinasforum Club. The second rule of Electricinasforum Club is: You do not talk about Electricinasforum Club. Third rule of Electricinasforum Club: someone yells stop, goes limp, taps out, quotes BS7671, the fight is over. Fourth rule: only two guys to a fight. Fifth rule: one fight at a time, fellas. Sixth rule: no shirts, no shoes, no TT to a garage. Seventh rule: fights will go on as long as they have to. And the eighth and final rule: if this is your first post at Electricinasforum Club, you have to fight.
 