G
Guest77
Very neat, my favorite so far, can't stand slotted screws though, phillips/pozzy everytime
Very neat, my favorite so far, can't stand slotted screws though, phillips/pozzy everytime
Nice!
First one done in-situ on the ceiling, not like all these on the bench efforts!!!![]()
Not seeing much potential to reterminate a few of these or are we going on the assumption of (in theory!) a few inches of T&E pushed into the ceiling? I know I can't be one to judge when I haven't done one myself but we loop at switch and it's very rare I have a spare minute in the shed to try these days.
......but we loop at switch and it's very rare I have a spare minute in the shed to try these days.
The thing is mate you'll speed up as you get more experienced. Don't try to force speed or you'll end up all fingers and thumbs and it;ll take you twice as long as it would if you were calm and doing it at a sensible pace.Thanks for the comments, it was really satisfying taking the time to do it as neat as possible. Now all I need to do is find someone who's willing to pay me to spend that long second fixing....
I've had to change a few fixings with bugger all slack in the cables, and vowed to never inflict the torment upon someone else!
If your looping in at the switch and not at the rose in your work place, we will accept that. Don't want to exclude you Resu due to the nature of your of your bosses install. Take a photo of both the switch connections and the rose and then submit them.
Will try but maybe not until week after next. First fixing a new building and EICR'ing next week!
This comp will still be open in 2+ weeks time mate. Gives everyone a chance to do the task and get their photos in.
Improvised? What with?