Hi,
Doing a EICR, and the usual limitations apply as to no lifting of floor boards ect..... also noted that im going to visually check 2 socket, 2 switches and 2 pendants on relevant circuits.
so my query is, when filling in the 'final circuits' section and 'Termination of cables' on the...
bowza
Thread
circuit
circuits
final
inspection
sockets
switches
Hi all had a weird one today, actually make it two, tested ringfinal continuity at the board lives were 0.00 and so were neutrals, earths were the same too, not sure why, is it a ring that has been interconnected causing a duff reading??
Secondingly tested another property's ringfinal circuit...
hi guys just heard from c&g
Thank you for contacting City & Guilds Customer Relations.
With regards to the 2391-301 Technical Knowledge of the Inspection, Testing and Certification of Electrical Installations. I can advise that due to centre demand and the need for potential re-sits, there will...
Customer wants new CU and a shed supply. (Let's not get into shed supplies - been doing some homework on this one).
Medium/smallish 4 bed house, has > 100M^2 area, but currently has single ring final, no split.
How to deal with Regs 314 about splitting the load? I'm not trying to spend...
Please could someone enlighten me on how grouping factors apply to ring final circuits run together, e.g. sharing holes through joists and walls, in a domestic situation?
For one RFC run in 2.5mm T&E under first floor boards (ref method B) the cable rating is 23A.
If you group two RFCs...
Hi,
for those looking to sit the 2391 before it finally bites the dust - the final, final, final written exam date of December 2012, appears to have been changed to March 2013. Search the C&G web site under 2391 for info.
Regards.
Apologies if this question sounds a bit basic but am a little confused at the mo and quite new to the game. Here goes -
I am trying to complete a NICEIC Highway Installation Certificate for a system where there is a 230 v TT supply coming into a roadside pillar into the main BS88 fused head...
Im currently studying electrical and im up to dead tests.
ive reached continuity of ring final circuit on my scenario cd , in therory i understand the procedure and what to do but im a little un sure on finding the mid point on the sockets .
please can sombody go threw it step by step in...
martinh89
Thread
circuit
continuity
final
higher
highest
please
point
ring
ring final
socket
spurs
Just spotted this little gem in my inbox this morning.......
Electrician Looking to recruit experienced Electricians to start work on a long term contract. Working on domestic projects across the UK.
We are recruiting for approx 1500 electricians required to work on...
I'll probably receive cries of abuse that this query was dealt with years ago but not when I was in the forum so........When testing ring can anybody think of a reason why the ring final tests (R1,R2 and Rn + link test) shouldn't be done from the back of a socket or other outlet on the ring. As...
Boatelec
Thread
circuit
conductors
final
ring
ring final
socket
test
testing
tests
To whom this may concern,
hello i would like to apply for all the electricians or electricians mates vacancies i am currently in college one day a week finishing off my electricians course which i started ten years ago and did not complete (2001-2004), i had to leave the course in my last year...
andymc85
Thread
college
course
electrical nvq
electrical work
final
job
nvq
training
I have a query around installing a socket outlet spur off a final ring circuit in a domestic installation which isn’t protected by any RCD’s at the DB. My understanding is that to comply with the current regulation the cable installed in the wall would need to be in the prescribe zones (which it...
steve100
Thread
cable
circuit
final
off
outlet
ring
ring final
socket
spurs
Hi,
I am studying for me 91 and am currently practicing on my home. I have found that my garage circuit consisting of a small 2 way CU with 1 of each; ring and lighting circuit (no RCD). I expected to see this circuit connected to the main CU through its own CB but in fact it is connected to...
Chris_Peef
Thread
circuit
connected
correct
don't
final
garage
newbie
question
ring
ring final
I was speaking to an Electrical Engineering suit not too long ago,
He reckons that there's talk of Ring Final Circuits being done away with and the preference to install Radials only.
Anyone else heard this little gem.
Whats the general preference of everyone for the two systems????
Anyone...
I have been asked to wire a garage its an new dwelling ,the client is wanting to change the garage into a dining room / play area for the kids , in the garage there is already a double skt but its half way up the wall it will pull back and could be used for a wall mounted tv skt , is it...
CERTA
Thread
circuit
final
fused
garage
off
radial
radial circuit
socket
So the powers that be have decided that it's too late to include an isolator within the new smart meter, great!
A perfect opportunity to provide solution to an ongoing problem wasted! What's the point???
My money's also on the chances that when the part p consultations come out it will be...
I am carrying out the continuity for a ring final test for a single phase TN-S system. When doing the end to end Neutral I don't get a reading!! What is wrong here and what Code does apply (Code 1-3)?
Many Thanks.
nazoom
Thread
circuit
disconnected
final
neutral
question
reading
regarding
ring
ring final
Can we carry out the continuity test for the ring final by connecting the line, neutral, and cpc end to end at any socket or do we have to identify and disconnect the conductors at the C/U? I am aksing as i think it is much easier to link the line, neutral, and cpc end to end at any socket...
nazoom
Thread
circuit
continuity
easier
final
parallel
question
regarding
ring
ring final
socket