Hi 1st post so go easy!Have just won a contract for 4 x 1.5kw systems.So have got to get MCS approved.
Any pointers or big no no would be helpful.
thanks
Paul
Hi Guys, just a quick question....
My mum lives in a council house and just had a new kitchen fitted, the workmen have installed 3 new single sockets, but I want to double check the minimum high for new sockets as these have been added on to the original circuit (ring main)
They have placed...
i need answer for this questions
1)state three reason for counducting a dead polrity test
2)state three electrodes involved when testingearth electrode reistnaces using an eath electrode resistances tester
3)
i need this fast as possible today
Hi All,
Testing due to Consumer unit change
r1 = 0.26
rn = 0.26
r2 = 0.46
R1+R2 = 0.19
Two of the sockets close to the consumer unit had lower than expected R1+R2 readings of 0.07 & 0.14
I can see how this is possible can someone shed some light on this for me please.
Thanks
Hello im Liam and i did Level 3 Certificate in Electrical And Electronic Engineering Technology at college but i was confused on what to do next, can i do installing? i know i got to get 17th edition.
Property has an old fuse board with 16mm tails is to be replaced with a new cu with 100A switch & 25mm tails, the main fuse is a 1361 100A fuse. The meter is only rated 80A. Do I just fone the local authority (S.S.E) to put in a 100A meter?
Halogen bulbs are electrical products so I thought I would ask here.
People say that 12V Halogen downlighters give off a better light but the hassles of replacing faulty transformers gives 230V Halogen downlighters the edge.
I have just read the Wiki page on Halogen bulbs and found this:
"A...
Been to look at a CU upgrade today and the bonding has been done in 10mm but it is looped from Gas to Water (all one piece of cable with no cuts/joins) what i am asking is wether or not this is ok as it is or should i seperate them and run seperate bonding to each service? This is a setup i have...
For example you have a ryefield board with 3 phase incoming cable split into 5 fuses for each meter. 3 meters are 3 flats, 1 for communal area and 1 a small shop unit. Now does ryfield board counts as a shared supply between all of them and therefore should be 5 notifications of each property...
arturas
Thread
becsa
certification
communal
competent
cps
notification
part
part p
person
question
quick
ryefield
scheme
separate
This might be a silly question but I'm a but baffled, if your are in a commercial building with an upstairs and downstairs, the mains is downstairs feeding all the downstairs circuits and a sub board upstairs. The sub board is feeding all the circuits upstairs. They Need extra points upstairs...
Hi all
I joined the forum this morning and am really pleased I did! I got some info and answers to my questions and in such quick time too! Great stuff!
I'm just a DIYer, and sometimes not even that. But I like to know about the things I do/pay people to have done, and it seems this will...
Hi guys.
So, been thinking about solar panels for a whole now, and haven't really gotten around to getting quotes etc in. But, with having a little more free time, I finally decided to look in to it a little more, and kicking myself for not looking inn to it when i first started back in feb...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.