Big Man
-
- Reaction score
- 5
Sorry to invade this post. Just a variance on the above... same situation apart from the plasterboard ceiling is up plastered and painted in a relatively new apartment. Customer wants light switch moved to opposite side of room as it’s currently in a silly place. 6m across room assuming it directly opposite. What do other people do to meet regs in this situation? Metal fixings and a load of large holes cut out the ceiling? It makes for a great fixing for the entanglement/ premature collapse issue but kinda messed up the fire integrity of the plasterboard ceiling. Any thoughts gratefully received also.