Hello all. I am trying to get 125 amps 3 phase back to a paintball field to power an electric air compressor.
I have a 3 phase 120/240v PG and E feed, 200A panel about 1300' feet away from the desired location. I have 2 transformers, so we can transform up to 480 to make the 1300' run, and then transform it back down. My question is what size aluminum wire do I need to get the job done.
Please excuse me if I mis-used any terms, this is pretty new to me.
Thank you
I have a 3 phase 120/240v PG and E feed, 200A panel about 1300' feet away from the desired location. I have 2 transformers, so we can transform up to 480 to make the 1300' run, and then transform it back down. My question is what size aluminum wire do I need to get the job done.
Please excuse me if I mis-used any terms, this is pretty new to me.
Thank you