hi all,
my nic dom installer assesment is this friday, my major job is a consumer unit change, the job was done 2 days before the 17th came in legally. ive put the upstairs lighting on the rcd side to get round supp bonding in bathrooms etc. the contractor through building control has passes everything so got no worries on that side of it.
thing im conserned about is in both bathroom there is a triple spot halagen light fitting. at mains voltage.
in one bathroom the ceiling is 2180mm and the edge of the fitting is 300mm away from the edge of the shower cubicle.
in the other the ceiling is 2300mm and edge of fitting is 330mm away from shower cubicle.
any comments!!
rich
my nic dom installer assesment is this friday, my major job is a consumer unit change, the job was done 2 days before the 17th came in legally. ive put the upstairs lighting on the rcd side to get round supp bonding in bathrooms etc. the contractor through building control has passes everything so got no worries on that side of it.
thing im conserned about is in both bathroom there is a triple spot halagen light fitting. at mains voltage.
in one bathroom the ceiling is 2180mm and the edge of the fitting is 300mm away from the edge of the shower cubicle.
in the other the ceiling is 2300mm and edge of fitting is 330mm away from shower cubicle.
any comments!!
rich