“Do you feel lucky punk, we’ll do you? go on then make my day and pull that cut out fuse”
The seal restorer will be around one day.
Seriously if you do pull cut out fuses please use something to prevent them being pulled out again once refitted, OK they are generally a good tight fit but the last thing anyone wants is a curious child who was watching you pulling it back out and sticking their fingers in there!

FD8A0F6C-ABDE-46AE-8E00-EB998E5E4579.jpeg
 
Then when they meter gets changed to one of those new fangled smart meters, they'll put in a 100A main fuse.
Doesn’t happen, not on my watch anyway, anything below 60A gets reported to the DNO, 60A rewirables get replaced with 63A, all others are left as found.New connections get an 80A left by the DNO.
 
Well, not sure what came first chicken or the egg, but I had someone ring me up last week, after having a smart meter fitted. The 'engineer' told my potential customer to get their tails upgraded to 25mm, 'cos they now have a 100amp main fuse.
 
Cut out to meter tails get upgraded to 25mm2 as standard provided the cut out terminals will accept them, load tails get left as they are if they are 16mm2 minimum or if below 16mm2 an isolator is fitted and the customer issued a warning notice recommending they contact a qualified electrician.
 

Reply to calculation check before i rip the flat to bits. in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Similar Threads

S
Hello Gents Once again I’m looking for your expertise to resolve the following application. A local supply Authority has supplied a single phase...
Replies
5
Views
1K
S
Hi, This my first post as I qualified last year and I have been picking up small bits of work, Consumer Unit changes and certs etc. However...
Replies
6
Views
890
Steve003
S
R
Any ideas on this one? I am doing a survey/eicr on an intake serving 9 flats belonging to a local housing authority. The cables are early 70's...
Replies
22
Views
5K
Guest55
G
I have been asked to carry out a rewire of a top floor flat when checking the existing supply characteristics. TN-S with a ZE of 1.24 ohms and...
Replies
27
Views
5K
E
I think I've Posted this before, but I've just updated it. Some of the sparks where I work still get a little confused of what the different areas...
Replies
58
Views
77K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock