i have 25 mm swa suplying cu in top flat, i want to put in 80amp type s 30ma rcd to protect cable and time delay.
problem i have is cable route is onto existing ceiling which will be lowered and pipe work in way to rcd so i was thinking of connecting to henley blocks in ceiling then down to rcd is this allowed?
while typing this out i thought i don't need henley blocks as i could put a back box in ceiling connected to armour and just peel back armour so no need to terminate if that makes sense?
problem i have is cable route is onto existing ceiling which will be lowered and pipe work in way to rcd so i was thinking of connecting to henley blocks in ceiling then down to rcd is this allowed?
while typing this out i thought i don't need henley blocks as i could put a back box in ceiling connected to armour and just peel back armour so no need to terminate if that makes sense?