Because I want to know what the "bare minimum" is that will comply for me to be able to upgrade the consumer unit in the house and reconnect the submain. I don't want to tell them that the tenant needs to take a day off work & move all their furniture & all the flooring needs to come up etc. to put a new submain in from the front door to the outbuilding over the back yard IF IT ISN'T NECESSARY!
"What is the point in asking questions" whats the point in the tone of these replies-
"Something is certainly obvious, but i'll limit my comments to the job you are asking about"
"What do you mean by 'especially for a letting agent'? Are their lives worth less than other peoples and so it's ok to install substandard earthing ?"
"To be honest i just can't be arsed"
"He'll probably just bung a twig in and call it a day"
I think you're trying to help but equally you want to shoot me down at the same time haha
Please tell me what would be wrong with the following-
Keep existing 2.5mm submain from 20A 30mA RCBO in house.
Disconnect 1.0mm CPC of 2.5 t&e in outhouse.
Install rod & bonding in outhouse.
Be as condescending as you like if you answer the question
"What is the point in asking questions" whats the point in the tone of these replies-
"Something is certainly obvious, but i'll limit my comments to the job you are asking about"
"What do you mean by 'especially for a letting agent'? Are their lives worth less than other peoples and so it's ok to install substandard earthing ?"
"To be honest i just can't be arsed"
"He'll probably just bung a twig in and call it a day"
I think you're trying to help but equally you want to shoot me down at the same time haha
Please tell me what would be wrong with the following-
Keep existing 2.5mm submain from 20A 30mA RCBO in house.
Disconnect 1.0mm CPC of 2.5 t&e in outhouse.
Install rod & bonding in outhouse.
Be as condescending as you like if you answer the question