From the electrical report. The mains cable running from the consumer unit to the shower was only 2.5mm as opposed to the minimum requirement of 6mm. The colour coding of this cable was red and black. Mr --- incorectly routed the cables instead of drilling through the joists,he ran the cable over the joists in a cut-out ,next to copper water pipes.He then routed the cables in trunking between the copper pipes,and across the boiler,this would cause them to get hot and is against the regulations.When consumer unit was fitted both tails used were blue,the live tail was covered with red tape,. Yes its a strange world when the police seem to be on the side of this cowboy.All the police have told me is take it up with trading standards.Which i have been now for last couple months +.