Do you actually worry about numby stuff like this??

I had to read your post twice, i couldn't believe what i was reading ...lol!!

I wonder if doing everything 100% by the book, has ever been achieved on a complete installation, New build or on a rewire etc... ?? wouldn't mind betting it hasn't!! lol!!
by what book?...oh you mean BS7671...that guidance note........lol.....
 
Do you actually worry about numby stuff like this??

I had to read your post twice, i couldn't believe what i was reading ...lol!!

Give me a break mate! Just trying to do things as right as possible!

I remember a thread a while back when some poor sod got a load of hassle because he'd been fishing new switch drops down a cavity and was told he was "breaking the rules" because they weren't supported.

I always do the job according to my judgement of the situation. In this case I'll be drawing cables through with the old ones where possible as I was always taught on site (although it differs to what I was taught in the classroom!)

Effectively, the thread was just to see if anyone else had any sensible alternatives or tips that I might not have been aware of!

I keep hearing people slagging off non-apprenticeship sparks for doing cowboy installs, so I thought I should get some additional opinions to make sure I do a reasonable job!
 
Ok here is my take on this if you clip a cable along a ceiling do you fix it clip to clip or do you leave a space between them ? My guess we all leave a space but put them close enough to make it look right so if you are placing a cable through holes in the joists then as long as it supports the cable and looks right then its fine. As for laying on the ground under a house it would not be my first choice but I am not here to tell lies I have had to do it sometimes because its not always possible to clip it all the way. I am an old fat git now and there is no way I can get my 48 inch waste under a 12 inch gap.
 
I have said it before and I will say it again the guys writing the regs have little or no knowledge of actually wiring anything only a mathematical knowledge of what things can do cables carry when a fuse should blow but they can not give a guarantee when it actually will blow these are safeguards that can still fail even if followed to the letter. I have seen a 40A mcb carry 125A and it nor the 100A hydro fuse blew so dont take every thing you read as gospel.
 
I hate it when cables are clipped or tied together in bunches then hidden away somewhere inaccessible.
I see no problem with resting cables on ceilings or on dry ground.
Only time I consider it dodgey, is where there's a suspended grid ceiling.
 

OFFICIAL SPONSORS

Back
Top