B
beaver74
hi all
can any one give referance to whether you can stick a rod at the load end of a circuit as aposed to supply end.
the job is an existing pme intake in the middle of a bungalow so un able to stick a rod in as concrete floors out in the garden is a lampost serounded by grass and at the post a rod is sunk in with an inspection box. 35ohm armered is conected to rod and insulated from network earth.been looking through book but can not find any referance to where rod should be i am of the apinion that this will work but never come across it this way before fond wish doing other work but not sure if to mention
can any one give referance to whether you can stick a rod at the load end of a circuit as aposed to supply end.
the job is an existing pme intake in the middle of a bungalow so un able to stick a rod in as concrete floors out in the garden is a lampost serounded by grass and at the post a rod is sunk in with an inspection box. 35ohm armered is conected to rod and insulated from network earth.been looking through book but can not find any referance to where rod should be i am of the apinion that this will work but never come across it this way before fond wish doing other work but not sure if to mention