I'm after some coding advice / opinions regarding EICR of warehouses / offices.
In others opinion would this be agreeable (helplines closed at weekends..)
The units are TT.
Where there is 4 pole 300mA S main switch to DBs, but single pole RCBOs or MCBs are utilised within them, C3?
Where DB from origin, & main switch is 3 pole (fixed neutral) C2
AND RCBOs are single pole also, C2
If the main switch was exchanged for 300mA S 4 pole- the remaining SP RCBOs C3 (no MCBs in this one)
On another, where tails are single insulated before an upfront 300mA, but are in galv trunking, would this warrant a code?
- (in my opinion) there is no way damage could occur.
Some 3P commando sockets don't have supplementary 30mA and are used for fixed equipment only such as roller shutters, chargers (e.g. bolted to the floor)- no code?
Some office areas plastic dado sockets (rings) don't incorporate 2 terminals- there is room for 10 - 20 PCs but they are currently vacant. No code?
Before I'm shot down, I can't recall ever doing an EICR on TT where there haven't been 4P isolators etc.
Thanks
I'm after some coding advice / opinions regarding EICR of warehouses / offices.
In others opinion would this be agreeable (helplines closed at weekends..)
The units are TT.
Where there is 4 pole 300mA S main switch to DBs, but single pole RCBOs or MCBs are utilised within them, C3?
Where DB from origin, & main switch is 3 pole (fixed neutral) C2
AND RCBOs are single pole also, C2
If the main switch was exchanged for 300mA S 4 pole- the remaining SP RCBOs C3 (no MCBs in this one)
On another, where tails are single insulated before an upfront 300mA, but are in galv trunking, would this warrant a code?
- (in my opinion) there is no way damage could occur.
Some 3P commando sockets don't have supplementary 30mA and are used for fixed equipment only such as roller shutters, chargers (e.g. bolted to the floor)- no code?
Some office areas plastic dado sockets (rings) don't incorporate 2 terminals- there is room for 10 - 20 PCs but they are currently vacant. No code?
Before I'm shot down, I can't recall ever doing an EICR on TT where there haven't been 4P isolators etc.