J
Jacko
Just been to speak to him, the man charged him £230 for the work.
He asked for a cert so he is dropping one around in the morning??
Also I looked again in the electric cupboard where the meter is and the 100a isolator, it looks like he has cut the main Earth coming from the western power supply and put it in a connector block, then taken a new 10mm earth to the 100a isolator so he has an earth there for his 2.5 twin and earth cable to supply the shed. I've read that the main Earth can't be cut and should be continuous??
He asked for a cert so he is dropping one around in the morning??
Also I looked again in the electric cupboard where the meter is and the 100a isolator, it looks like he has cut the main Earth coming from the western power supply and put it in a connector block, then taken a new 10mm earth to the 100a isolator so he has an earth there for his 2.5 twin and earth cable to supply the shed. I've read that the main Earth can't be cut and should be continuous??
