Hi all, i am planning to install electrics to a garden room, cable length from CU is approx 45meters external,burried.
Should i use 3 core SWA and rely on earth from there or treat it as a T-T earth installation and just run 2 core from C/U ? there will be 2KW heater and 4 2G sockets plus led lighting and possibly Hottub retrospectively! Planning on 40amp MCB from C/U to give life to it, should i take this approach or split off meter tails and C/U in the shed itself?
Should i use 3 core SWA and rely on earth from there or treat it as a T-T earth installation and just run 2 core from C/U ? there will be 2KW heater and 4 2G sockets plus led lighting and possibly Hottub retrospectively! Planning on 40amp MCB from C/U to give life to it, should i take this approach or split off meter tails and C/U in the shed itself?