How many kw do you need to pile ?
We were going to self pile a 100kw on a job next week , but the manufacture of the mounts were very iffy about us doing so ourselves ( warranty issues on the galv ) and strongly pushed us towards auguring out the post positions first and then back filling with concrete .
 
I believe Beba Energy UK own specialist pile driving equipment that you can hire or contract them to install the uprights. Expensive stuff though.
 
Post drivers work but they are a much more blunt instrument - it's difficult to get the spacing and alignments 100% accurate using that but they are much cheaper.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Lincolnshire

Thread Information

Title
Ground Mount
Prefix
N/A
Forum
Solar PV Forum | Solar Panels Forum
Start date
Last reply date
Replies
10

Thread Tags

Advert

Thread statistics

Created
jason121,
Last reply from
jason121,
Replies
10
Views
1,706

Advert

Back
Top