How many kw do you need to pile ?
We were going to self pile a 100kw on a job next week , but the manufacture of the mounts were very iffy about us doing so ourselves ( warranty issues on the galv ) and strongly pushed us towards auguring out the post positions first and then back filling with concrete .
 
I believe Beba Energy UK own specialist pile driving equipment that you can hire or contract them to install the uprights. Expensive stuff though.
 
Post drivers work but they are a much more blunt instrument - it's difficult to get the spacing and alignments 100% accurate using that but they are much cheaper.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread starter

Joined
Location
Lincolnshire

Thread Information

Title
Ground Mount
Prefix
N/A
Forum
Solar PV Forum | Solar Panels Forum
Start date
Last reply date
Replies
10

Thread Tags

Advert

Thread statistics

Created
jason121,
Last reply from
jason121,
Replies
10
Views
1,706

Advert

Back
Top