Discuss I have to write a method statement for my bay in the day exam in the Electrician Courses : Electrical Quals area at ElectriciansForums.net

Reaction score
0
Hi

Below is a picture of the bay in a day exam I was supposed to take before the lockdown.

I've got a method statement to write on my bay in a day exam, the only problem is that due to lockdown I've been out of college for so long I can't remember the dimensions of the materials I need. I think it will be the same across colleges so if anyone could answer the following it would be much appreciated

1)length of the swa, 2.5mm 3 core?
2)length and size of the cable tray, where along the tray to make the cuts?
3)length of PVC conduits, size, and how far along to make the bend in the one that is bent?
4)dimensions of the steel trunking?
5)length of the two stretches of steel conduit?


Thanks in advance
 
TL;DR
Below is a picture of the bay in a day exam I was supposed to take before the lockdown.
I've got a method statement to write on my bay in a day exam, the only problem is that due to lockdown I've been out of college for so long I can't remember the dimensions of the materials I need.

Attachments

  • Screenshot_20200608_134740.jpg
    85 KB · Views: 37
I may be misunderstanding this, the drawing is not to scale and I doubt dimensions would figure in a method statement. Presumably you are asked to do a RAMS???? Or is Method statement something different now?
 
1591649612113.png

Here's an exceprt from the accompanying book for your course (you'll know the one if you have it). Should give a starting point as to what, and not to include.
 
I may be misunderstanding this, the drawing is not to scale and I doubt dimensions would figure in a method statement. Presumably you are asked to do a RAMS???? Or is Method statement something different now?
So no it is a method statement but as we didn't do the proper preparation before the lockdown, we didn't get to discuss the method statement. so as I would be making markings and cuts on materials throughout the exam it I didn't know if it would be important to include the details I.e. Dimensions and measurements
 
So no it is a method statement but as we didn't do the proper preparation before the lockdown, we didn't get to discuss the method statement. so as I would be making markings and cuts on materials throughout the exam it I didn't know if it would be important to include the details I.e. Dimensions and measurements
If you haven't got them then you can't include them bit you can still state how you're going to do it, with what equipment and what follows on from it.
 
Well a Method Statement is the method of working in relation to the risk assessment you have made regarding the job in hand. So for the above you would assess the risks in putting such a rig up and commissioning it. Including risks with tools and persons on site etc. etc. The Method statement will show how you obviate those risks by working in a way that is safe. So your Method Statement will show how you are working and planning to keep persons and property safe bottom line.
Also as you have had weeks off, I would have thought you might have attacked this all much earlier. You could look at the HSE web site and look at these terms for clues as to what to do?
 

Reply to I have to write a method statement for my bay in the day exam in the Electrician Courses : Electrical Quals area at ElectriciansForums.net

Similar Threads

Hello all, I've just been perusing the AM2/E/S threads on here. Thought you might like a bit of a review. If, like I did, you find yourself...
Replies
7
Views
2K
This might be long so feel free to grab a brew. So, as some of you may know, i'm a 34 year old who has been dying to get into the industry. I...
Replies
66
Views
9K
A
Hi guys I’m new to this site however just thought I’d give my best explanation of what the AM2 was like. If this is in the wrong forum I’m very...
Replies
29
Views
12K
first day done of my AM2 exam. Just wanted to let people know what I done and if I will loose any marks. So first of all risk assessment and safe...
Replies
31
Views
9K
B
Prefix - I've tried to post this in automotive, but it would not let me. This may be because I have not been recently active. Apologies if this is...
Replies
3
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

Electrical Courses

This is the main Electrical Courses at ElectriciansForums.net. Find local recommended electricians courses. Avoid training "company" scams. Always go view the training centre before booking any electrical courses.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock