S
samh909
" The supply to the detached workshop has been installed using a two-core steel wired armoured cable (SWA). Describe the most appropiate method of testing continuity of CPC to this distribution circuit "
" The supply to the detached workshop has been installed using a two-core steel wired armoured cable (SWA). Describe the most appropiate method of testing continuity of CPC to this distribution circuit "
r1+r2 ;-)


or (R1+R2)..try R1+R2. terminology fail there, mate.