Had these rods been installed, inspected tested in the correct manner using the correct testing equipment??I read a couple of references to ground rods and both stated that they must be buried in the ground but one said 3 inches visible and the other said less than 12 inches visible.
I thought they had to be fully buried and even covered .
Please confirm I’m correct z(for once!)
These cases were documented but they didn’t say whether they were inspected.Had these rods been installed, inspected tested in the correct manner using the correct testing equipment??