Hi all,

Just a question around phase numbering?

The photo of the 3 phase cutout attached has L1, L2, L3 presumably for Line 1,2,3, fairly explanatory.

However in the other picture of three single phase cutouts some are labelled L1, L2, L3 but they are single phase, is this just where the wrong sticker has been used as surley they would all just need to be labelled L1 as they are single phase cutouts?

Also I don't know why GTC don't seem to label the neutral N.

Thanks,
James.
 

Attachments

  • 3 Phase.png
    3 Phase.png
    164.9 KB · Views: 116
  • Single Phase.png
    Single Phase.png
    540 KB · Views: 85
Hi all,

Just a question around phase numbering?

The photo of the 3 phase cutout attached has L1, L2, L3 presumably for Line 1,2,3, fairly explanatory.

However in the other picture of three single phase cutouts some are labelled L1, L2, L3 but they are single phase, is this just where the wrong sticker has been used as surley they would all just need to be labelled L1 as they are single phase cutouts?

Also I don't know why GTC don't seem to label the neutral N.

Thanks,
James.
The L1, L2,L3 indicate which core of the three phase distributor the single phase service is connected to.
 
Before the cutout, L1, L2, L3 are the correct markings for the circuit as they are relating to the phase they are connected to.
After the cutout, being a single phase supply, just marking it L would be considered normal practice and it will loose the phase number as it’s not relevant for a single phase supply.
 
Before the cutout, L1, L2, L3 are the correct markings for the circuit as they are relating to the phase they are connected to.
After the cutout, being a single phase supply, just marking it L would be considered normal practice and it will loose the phase number as it’s not relevant for a single phase supply.
Thanks, that makes sense, I was wondering why GTC didn't use a neutral sticker like other DNOs but now I know all that is concerned with labelling is the phase number of the incoming concentric cable.

I did originally think the labelling was to state which side of the cut out has its L terminal and N terminal.
 
Redundant(?) L2, L3 labels on single-phase cutouts:
The DNO would like as close a balance as possible between phases. If the above example is of a typical residential street with most installations being single-phase - then assuming the DNO's records were less than perfect - it would be convenient for them to know, when they connected new houses, which would be the best phase to use in each case. (without resorting to some very long test leads! - or awkward cable-tracing test gear).
 

OFFICIAL SPONSORS

Back
Top