A
aaronstuart
Hello all,
Mains incoming water pipe has been altered, there is about 12-15 inches of coppper pipe entering from the ground into the kitchen then around 3 - 4 mtrs plastic pipe before going back to copper piping, do I still need to bond the pipe and also a link between the plastitc to make continuity?
Thanks Aaronstuart..
Mains incoming water pipe has been altered, there is about 12-15 inches of coppper pipe entering from the ground into the kitchen then around 3 - 4 mtrs plastic pipe before going back to copper piping, do I still need to bond the pipe and also a link between the plastitc to make continuity?
Thanks Aaronstuart..