Hi,

Quick issue here, went to a job today, basically the roof you can see is a garage roof attached to the side of a bungalow, the roof is coming off and being raised up in line with the rest of the house and being converted into a dining room and having a breeze block liner inside.

Other than all the other work, the builder wants a new board / move old position to opposite wall but on other side and a meter to the left, so probably 5 - 6 meters worth of meter tails.

Now I know the 3m rule, etc, but just wanted a second opinion on it, would you do it? I don't feel to happy with it to be honest, its more the fact the meter tails will be run / clipped along side the joist above the ceiling and not RCD protected, its a bit iffy isn't it.

The builder im dealing with, really nice bloke, but he was deaf, very nice bloke, but it was a challenge trying to have a conversation with him about £3k of work that needs to be done and lots of bits and pieces. You can imagine, there was quite a lot of notes and writing down going on.

Oh the supply is just the other side of the wall in an external cabinet.


photo.jpgphoto1.jpg
 
fit ametal case KMF, 80A in the meter cabinet on short 25mm tails . then come off that in 16mm 3 core SWA to CU. if replacing the CU use a metal case CU. if not, then gland the SWA into a galv ad. box and continue the tails into CU. use earthing nuts.
 
The new CU is going in the lounge kitchen area bit so it's got to look nice, so metal clad is out the window, so haven't got opions available like suggested as it wouldn't look great. I did think of this bit ruled it out, I have done it before as suggested but this time I can't get away with an industrious looking cu.
 
Hi,

Quick issue here, went to a job today, basically the roof you can see is a garage roof attached to the side of a bungalow, the roof is coming off and being raised up in line with the rest of the house and being converted into a dining room and having a breeze block liner inside.

Other than all the other work, the builder wants a new board / move old position to opposite wall but on other side and a meter to the left, so probably 5 - 6 meters worth of meter tails.

Now I know the 3m rule, etc, but just wanted a second opinion on it, would you do it? I don't feel to happy with it to be honest, its more the fact the meter tails will be run / clipped along side the joist above the ceiling and not RCD protected, its a bit iffy isn't it.

The builder im dealing with, really nice bloke, but he was deaf, very nice bloke, but it was a challenge trying to have a conversation with him about £3k of work that needs to be done and lots of bits and pieces. You can imagine, there was quite a lot of notes and writing down going on.

Oh the supply is just the other side of the wall in an external cabinet.


View attachment 25688View attachment 25689
You know more than me then, if 2 tails and an earth were tied together for 4 to 5 mtrs I couldn't see a problem, okay I am aware the numpties at the IET may think differently with their nice ties and suits on lol
 
you can use a plastic CU if you ensure that the SWA is restrained above it so as not to put stress on the gland into CU.
 
The new CU is going in the lounge kitchen area bit so it's got to look nice, so metal clad is out the window, so haven't got opions available like suggested as it wouldn't look great. I did think of this bit ruled it out, I have done it before as suggested but this time I can't get away with an industrious looking cu.

Make off the SWA into a metal box fitted flush behind the CU.

If fitting a CU somewhere visible I do this with all of the cables going to it, they can all come straight in to the back of it then without being seen. Plus it's easier for the plasterers to get the wall flat than if there is a big bunch of cables sticking out.
 
You know more than me then, if 2 tails and an earth were tied together for 4 to 5 mtrs I couldn't see a problem, okay I am aware the numpties at the IET may think differently with their nice ties and suits on lol

Unfortunately it's the numpties from the Networks that insist on the 3 metre rule of thumb, and that is exactly what it is a rule of thumb, you could ask them that your extending 5 meters and there maybe a good chance they would say yes.

Above a ceiling does not need RCD protection re regs 522.6,100 & 522.6.102
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Market Harborough

Thread Information

Title
Meter tail length
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
18
Unsolved
--

Advert

Thread statistics

Created
uksparks,
Last reply from
jaypp,
Replies
18
Views
3,516

Advert

Back
Top