B

ben2012

quick question as im not 100% sure, ive been asked to move a 3ph board from one side of a wall to the other side of the wall. now the set up is SWA glanded off into a 6x6 metal trunking running from top to bottom of the wall. supply then goes into an isolator, out of isolator into a meter and into dis board (in single insulated cables). my idea is to pull cables out of dis board, drill through back of metal trunking putting plastic pipe through wall then streight into back of dis board. question is would i need an isolator on the other side of the wall before it goes into dis board? (the room it is currently in, is only accessed via another business premises)

sorry for the long winded question!

thanks
 
i would think that isolation of the DB should be achieved without having to go into another business premises. what if there's a need to isolate and you have no access to the isolator? fit one with DB.
 
this was my thought to be honest, it just seemed a bit over the top given the distances involved! would you be happy with running the cable through the wall in a plastic duct?
 
as long as the plastic protruded slightly into the trunking to protect the cable/s from sharp metal edges, fine.
 
You have not explicitly said that the DB has no main switch or protective device, are we correct to assume this from the fact there's a separate isolator..?
 
the DB has its own 125amp main switch, the supply comes from origin (recently installed by others) to an Isolator then into meter before going into DB. although i see that potentially i require a isolator in the new location, im kind of failing to see what a seperate isolator is going to achieve that simply turning off the main switch on the DB wont do?
 
So the isolator is before the meter, so i take it that you are moving the meter too?? So it makes sense to move the existing isolator with the meter. Provide a suitably sized JB at the existing isolator position to extend the SWA supply conductors through the wall to the new position.

Can't really see that you have too much of a problem here at all!!
 
My gut feeling tells me if the new DB is in a totally different business premises seperate from the original isolator I'd like to fit an additional isolator in the new location as a sort of belt and braces job. This isnt a regulations requirement so if not wanted/needed then run with the existing SWA straight into the new DB.
 
My gut feeling tells me if the new DB is in a totally different business premises seperate from the original isolator I'd like to fit an additional isolator in the new location as a sort of belt and braces job. This isnt a regulations requirement so if not wanted/needed then run with the existing SWA straight into the new DB.

What, and forget about the meter altogether?? lol!!
 
So you are going to end up with circuits from one premises going through someone else's property not ideal.
 
The installation is a converted mill and the mill owners have put the supply in the current position and although the owners of the new unit in the mill can access the meter and isolator via another unit, if a circuit were to trip it wouldn't always be easy to get access hence them wanting to just move the board. Only the meter tails (effectively) would be coming through the wall. All the circuits from the new unit are in the new unit and wouldn't be coming into the DB via another unit first. (If that makes sense!)
 