O.K the new AM2 consists of Safe Isolation and risk assessment ( remember to ask permission to isolate and put key in pocket) @1.5 hrs. The build? You are given the specs (read it closely) which is basically A 3 socket ring main with a spur (in singles in Dado trunking). A lighting circuit in Twin and 3 core 2 way and intermediate with the twin at the light. A motor circuit with DOL ( set thermal overload and check start switch is connected). A carbon Monoxide detector in FP200, A commando socket ( You will be using SY,SWA and singles). an S-plan system but its all push in connectors in the control box :cheesy:. A small box to box cat5 ( but make sure its seperated from current carrying cable in Dado) you do not install any containment as its all there and The DB is 3 phase @ 8.5HRS. Then inspect and test (fully observed) you test your build and do the paperwork (schedule of inspections etc.)@3.5 hrs. Then Fault finding is safe isolation again plus 7 faults (find them all) but you need 5 write where the fault is what it is and how to rectify it@ 3.5hrs. Online Exam? 30 questions mostly H&S, guidance note 3 and BS7671 @ 1 hr and it's open book..You also have the OSG and GN3 for inspect and test ( just remember on r1+r2 on lighting circuit operate switches and also on insulation test) Have fun
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.