Ive since started doing it 1L1, 1L2.....etc its just a habit from panel building lol.... still complies but yep the 1L1 method is better suited.
I always code mine up.
Though I dont use individual codes like you have there.
I go 1L1, 1L2, 1L3 etc or 1L123 etc for 3 phase.
Bring back RYB......
I preferred the even older R W B ................ it was nice and patriotic.
Isobar4 is now obsolete, what you have is Acti9, the sliders are now interlocked so they can't be moved unless breakers are fitted, if you have then the board is probably ****ed!
This has been known for about 3 months if not more now, that the Isobar range was to be obsoleted.
Also all the C60H series breakers are now obsolete.
How the hell are they interlocked I couldnt see anything?

Isobar4 is now obsolete, what you have is Acti9, the sliders are now interlocked so they can't be moved unless breakers are fitted, if you have then the board is probably ****ed!
This has been known for about 3 months if not more now, that the Isobar range was to be obsoleted.
Also all the C60H series breakers are now obsolete.