Thanks - so in asking them resolve the switch, you are saying that we were leaving ourselves open to however long it took?
 
cat, I dont want to be rude have you enquired about the charges .considering you rent you property out to a Tennent .
has long has the EICR comes back satisfactory I would be happy if it was me .
 
It's great to get feedback - buzzlightyear not rude at all but I am not sure what you mean - the tenant and I have been in contact about the works, yes. And some of them were carried out whilst I was at the property. (That's when I got the impression that the work was a bit slow, which is why I thought the invoice was so high).
 
Sorry. I hadn't spotted the EICR.
Some of that seems a little steep. I used to do some inspection, and remedial work for one of the local letting agents. They had a rule, and that was not to use the same electrician to do both the inspection and the remedial.
They had found that using one organisation to do both left them open to certain 'work creation' practices.
 
I think the labour cost is about 21 hours. There's another £288 which is the cost of the EICR and PAT testing, which is fine, we knew that was a fixed cost. There's nearly £300 for materials as well, which we naturally accept. Altogether though it feels like a lot - but I wanted to come here and find out your thoughts before I did anything about it.

I totally agree (now, with the benefit of hindsight) Taylortwocities, I would in future get the EICR done by a firm that maybe only did testing.
 
Last edited by a moderator:
I think the labour cost is about 21 hours. There's another £288 which is the cost of the EICR and PAT testing, which is fine, we knew that was a fixed cost. There's nearly £300 for materials as well, which we naturally accept. Altogether though it feels like a lot - but I wanted to come here and find out your thoughts before I did anything about it.

I totally agree (now, with the benefit of hindsight) Taylortwocities, I would in future get the EICR done by a firm that maybe only did testing.
You should have asked to have the test done, cert issued followed by a quote for remedial repairs, this should have been agreed prior to ANY testing taking place, unless of course you gave Matey Carte Blanche to repair as he went along with the EICR, in my opinion.
 
Not the most intuitive invoice to understand, although I think the EICR was quite clear.

Fault finding will take considerable more time than installation of works, unless you strike lucky.

I'm reading you have two invoices, one £225 & one for £845?
​
 
Thanks - agreed, we were in a rush and it was a very highly thought of local company, so we felt we could trust them. We didn't give them carte blanche - as we had quotes for the work but it wasn't broken down into parts and labour - and as for asking them to sort the cooker switch, I did trust they would do it in a timely way. But do you think the labour cost is unreasonable for the work done?
 