Hello all, sorry for going on a bit.
I am pricing to do a PIR on a hotel, I called in today to have a quick look and there is a main islolator feeding 2 x 3 phase boards, each with approx 25 (single phase) circuits, 4 of which are sub-mains feeding other DBs around the hotel, these DBs has approx 15 circuits each.
So basically there is over 100 final circuits.
I believe that alot of sparks doing this kind of work charge approx £25 a circuit, if so that is obviously over £2500, which I reckon the customer would have heart failure.
I don't have much experience in testing installations this big, but I am ready to take the step up, however I am worried about pricing too high as the customer also has many properties, etc of which I get the work for.
I am pricing to do a PIR on a hotel, I called in today to have a quick look and there is a main islolator feeding 2 x 3 phase boards, each with approx 25 (single phase) circuits, 4 of which are sub-mains feeding other DBs around the hotel, these DBs has approx 15 circuits each.
So basically there is over 100 final circuits.
I believe that alot of sparks doing this kind of work charge approx £25 a circuit, if so that is obviously over £2500, which I reckon the customer would have heart failure.
I don't have much experience in testing installations this big, but I am ready to take the step up, however I am worried about pricing too high as the customer also has many properties, etc of which I get the work for.