Discuss Periodic inspection in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

The thread in question is a restaurant so unless it is a 24/7 concern the actual testing would be 100% unless the client has confirmed otherwise.
Regardless of the type of premises it doesn’t negate the fact that it may not be possible to carry out 100 percent inspection. I’m not arguing that a 100 percent test shouldn’t be done I’m just saying that it’s not always possible and the reasons behind it.
 
Regardless of the type of premises it doesn’t negate the fact that it may not be possible to carry out 100 percent inspection. I’m not arguing that a 100 percent test shouldn’t be done I’m just saying that it’s not always possible and the reasons behind it.
Maybe so but I test from small retail outlets to concerns in the City of London and with correct corporation, foresight and planning it can happen.
 
Maybe so but I test from small retail outlets to concerns in the City of London and with correct corporation, foresight and planning it can happen.
Ok I’m not disputing that. I’m just saying that it is not always possible due to operational and other limitations to test 100 percent of the installation within the recommended frequency of inspection time frame and that perhaps it would be better to do more frequent but smaller inspections to allow for a near to a 100 percent inspection and minimum disruption to business.
 
My issue with not 100% testing of circuits is the "critical" circuit is always likely to be unavailable for testing.

More regular test intervals only result in highlighting the circuits "unavailability" more often.
 

Reply to Periodic inspection in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Hi all, Carrying out a periodic inspection at a domestic installation. Semi- detached house on a row of houses. I cannot for the life of me...
Replies
8
Views
866
Hi Guys, looking at doing Initial and Periodic inspecting and testing. Looking between the CandG and EAL Just wondering if I can ask peoples...
Replies
16
Views
630
Solar PV preventative maintenance contracts. What do you guys like to include (and exclude) when putting together preventative maintenance...
Replies
0
Views
250
Hi all, Probs a simple one here but when testing a 3 phase board for ze as part of a periodic inspection plus part initial verification of a...
Replies
4
Views
1K
Not really a Question but its more a Point that the other Education Bodies out there than City and Guilds Granted most Employment agency dont...
Replies
3
Views
720

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock