T
thekingiam
pricing a job up this morning, wants it done by next friday. wants cu moved to hall downstairs with meter explained i can't move meter or supply but he still wanted quote.
all the electrics comming down 3 metre walls in pvc trunking he wants them sunk and back boxes sunk, looked at cu and electrics and all looks new brought meter to test cu but no ladders!!
it's a flat the size of a three bed house as loft has been converted.
i imagine if all tests out ok i could complete rings at original cu and break rings closer to new cu and extend cable taking into account vd length of run etc.
how would you price this as a rewire incase issues or as a partial rewire, i meen adding cost of cable in case?
all the electrics comming down 3 metre walls in pvc trunking he wants them sunk and back boxes sunk, looked at cu and electrics and all looks new brought meter to test cu but no ladders!!
it's a flat the size of a three bed house as loft has been converted.
i imagine if all tests out ok i could complete rings at original cu and break rings closer to new cu and extend cable taking into account vd length of run etc.
how would you price this as a rewire incase issues or as a partial rewire, i meen adding cost of cable in case?